The Challenge

A client operating a 200,000 sqft FMCG warehouse needed a complete racking fit-out with extreme urgency. With operations due to begin shortly, they required a full-scale solution from enquiry to installation in under 10 weeks, with product on site and ready for build within just four.

The Solution

Nene responded immediately, attending site in Manchester the day after the initial enquiry to carry out a full assessment. A detailed quote was delivered and signed off by the end of that same week. The project called for a full installation of adjustable pallet racking with mesh decking throughout. Thanks to Nene’s extensive stockholding and experienced installation team, all materials were delivered to site within the required four-week window. The fit-out was delivered efficiently, on schedule, and to a high standard. The entire project was completed in under 10 weeks from first contact to final handover.

The Finished Project

Get the Right Storage Solution for Your Warehouse

Maximise your warehouse efficiency with our tailored storage solutions. Whether you need adjustable racking, cantilever systems, or high-density drive-in racking, Nene Warehouse Solutions has the expertise and options to meet your unique needs.

Other Projects

Pro Tiler Tools/Topps Tiles – Northampton

Case Studies Pro Tiler Tools/Topps Tiles – Northampton The Challenge Pro Tiler Tools/Topps Tiles, operating from a 140,000 sq ft [...]

IKEA – Sheffield

Case Studies IKEA – Sheffield The Challenge Global furniture manufacturer, IKEA, was in need of a new warehouse and retail [...]